1. |
There should be continuity between the No.1 and No.3 terminals
when power and ground are connected to the No.2 and No.10 in the ICM-A.
|
1. |
There should be continuity between the No.16 and No.15 terminals
when power and ground are connected to the No.13 and No.14 in the ICM-A.
|
1. |
There should be continuity between the No.8 and No.20 terminals
when power and ground are connected to the No.13 and No.12 in the ICM-A.
|
1. |
There should be continuity between the No.19 and No.7 terminals
when power and ground are connected to the No.13 and No.11 in the ICM-B.
|
1. |
There should be continuity between the No.12 and No.22 terminals
when power and ground are connected to the No.21 and No.22 in the ICM-B.
|
1. |
There should be continuity between the No.17 and No.4 terminals
int the ICM-A when power and ground are connected to the No.2 and No.1
in the ICM-B.
|
1. |
There should be continuity between the No.20 and No.16 terminals
when power and ground are connected to the No.17 and No.6 in the ICM-B.
|
1. |
There should be continuity between the No.15 and No.13 terminals
when power and ground are connected to the No.5 and No.9 in the ICM-B.
|
1. |
There should be continuity between the No.6 and No.18 terminals
in the ICM-A when power and ground are connected to the No.4 and No.3
in the ICM-B.
|
Manual heating and air conditioning
The heating and cooling system can be controlled manually by pressing buttons
or turning knob(s) other than the AUTO button. In this case, the system works sequentially
according to the order of but ...
ICM (Integrated Circuit Module) Relay Box Component
...
PTG Spindle Installation
1.
Connect the PTG spindle, bracket and connector.
Tightening torque :
6.9 ~ 10.8N.m (0.7 ~ 1.1kgf.m, 5.1 ~ 8.0 lb-ft)
...