Inspection
1.
Connect the GDS on the Data Link Connector (DLC).
2.
Measure the output voltage of the RPS at idle and various engine
speed.
...
Rear Blower Unit Replacement
1.
Disconnect the negative (-) battery terminal.
2.
Recover the refrigerant with a recover/recycling/charging station.
3.
...
Condenser Replacement
1.
Recover the refrigerant with a recovery/recycling/charging station.
2.
Disconnect the negative (-) battery terminal.
3.
...