1. |
Connect the GDS on the Data Link Connector (DLC).
|
2. |
Start the engine and measure the output voltage of TPS 1 and 2
at C.T. and W.O.T.
|
3. |
Turn the ignition switch OFF and disconnect the scantool from
the DLC.
|
4. |
Disconnect the ETC module connector and measure the resistance
between the ETC module terminals 1 and 2.
|
1. |
Turn the ignition switch OFF.
|
2. |
Disconnect the ETC module connector.
|
3. |
Measure resistance between the ETC module terminals 3 and 6.
|
4. |
Check that the resistance is within the specification.
|
Operation and Leakage Check
Check all of the following items:
Component
Procedure
Brake Booster (A)
Check brake operation by applying the brakes during a test drive.
If the brakes do not ...
Installation
•
Install the component with the specified torques.
•
...
Specifications
Direct control VFS[UD/B]
▷ Control type : Normal high type
Control Pressure kpa
(kgf/cm², psi)
539.370 ~ 0 ( 5.5 ~ 0, 78.23 ~ 0)
Current value(mA)
...