Inspection
1.
Check the signal waveform of the CMPS and CKPS using the GDS.
Specification:
Refer to “Wave Form”
...
Rear Hub - Carrier Disassembly
1.
Remove the hub assembly mounting bolts (A-4ea) from the rear axle
carrier (B).
Tightening torque:
78.5 ~ 88.3N.m (8.0 ~ 9.0 ...
For best battery service
Keep the battery securely mounted.
Keep the battery top clean and dry.
Keep the terminals and connections clean, tight, and coated with petroleum
jelly or terminal grease.
Rinse any spill ...