1. |
Apply tire soap or lubrication to the top and bottom tire beads.
|
2. |
To fit the bottom bead, position the valve at the 5 o’clock position
relative to the head on the tire changing machine.
|
3. |
Place the tire on the rim so the bottom bead touches the edge
of the rim after the valve (6 o’clock). Rotate the rim clockwise, and
push down on the tire at the 3 o’clock position to fit bottom bead.
|
4. |
After bottom bead is on tire, rotate the rim until the valve is
at the 5 o’clock position relative to the head on the tire changing
machine. Push down on the tire at the 3 o’clock position and rotate
the rim clockwise to fit the top bead.
|
5. |
Inflate the tire until both beads seat.
|
Trailing Arm Replacement
1.
Remove the rear wheel & tire.
Tightening torque :
88.3 ~ 107.9N.m (9.0 ~ 11.0kgf.m, 65.1 ~ 79.6lb-ft)
...
Alternator Components
1. Overrun Alternator Pully (OAP)
2. Front bracket
3. Front bearing
4. Rotor
5. Rear bearing
6. Rear bracket
7. Through bolt
8. Regulator assembly
9. Regulator b ...
Fuel Sender Installation
1.
Install in the reverse order of removal.
...