|
1. |
Disconnect the Inhibitor swtich connector.
|
2. |
Ignition KEY "ON"" & Engine "OFF".
|
3. |
Measure voltge between supplied power and ground at inhibitor
circuit.
|
1. |
Connect the Inhibitor switch connector.
|
2. |
Ignition KEY "ON" & Engine "OFF".
|
3. |
Measure voltages between each terminal and chassis ground during
shift lever changed "P, R, N, D".
Signal Code Table
|
Delivery Pipe Installation
•
Install the component with the specified torques.
...
Power Door Lock Actuators Inspection
Front Door Lock Actuator
1.
Remove the front door trim.
(Refer to Body - "Front door")
2.
Remove the front door module.
...
PTG Spindle Removal
1.
Disconnect the negative (-) battery terminal.
2.
Remove the tailgate trim and Luggage side trim.
(Refer to the Body - "Tailgate& ...