• |
Adjust a shift cable.
|
• |
Refill engine with engine oil.
|
• |
Refill a transaxle with fluid.
|
• |
Refill power steering fluid.
|
• |
Refill a radiator and a reservoir tank with engine coolant.
|
• |
Place a heater control knob on "HOT" position.
|
• |
Clean battery posts and cable terminals and assemble.
|
• |
Inspect for fuel leakage.
|
- |
After assemble the fuel line, turn on the ignition switch (do not operate
the starter) so that the fuel pump runs for approximately two seconds
and fuel line pressurizes.
|
- |
Repeat this operation two or three times, then check for fuel leakage
at any point in the fuel line.
|
• |
Bleed air from the cooling system.
|
- |
Start engine and let it run until it warms up. (until the radiator fan
operates 3 or 4 times.)
|
- |
Turn Off the engine. Check the level in the radiator, add coolant if
needed. This will allow trapped air to be removed from the cooling system.
|
Alternator Specification
Alternator
Item
Specification
Rated voltage
13.5V, 130A
Speed in use
1,000 ~ 18,000 rpm
Voltage regulator
IC Regulator bui ...
Engine Cover Removal and Installation
1.
Remove the engine cover (A).
2.
Install in the reverse order of removal.
...
Side Airbag (SAB) Module Installation
Be sure to install the harness wires not to be pinched or interfered
with other parts.
...