1. |
After disconnecting the vapor hose from the PCV valve, remove
the PCV valve.
|
2. |
Reconnect the PCV valve to the vapor hose.
|
3. |
Inspect the PCV vlave operation.
|
4. |
If the vacuum is not felt, clean or replace the vapor hose.
|
Circuit Diagram
...
Operation
Evaporative System Monitoring
Evaporative And ORVR Emission Control System
This system consists of below items;
-
Fill vent valve
-
F ...
Delivery Pipe Installation
•
Install the component with the specified torques.
...