1. |
Install the power tailgate latch & PCU assembly.
|
2. |
Install the tailgate trim.
|
3. |
Connect the negative (-) battery terminal.
|
Telemetics Unit (TMU) Installation
1.
Install the TMU unit.
2.
Install the AVN head unit and center fascia panel.
3.
Connect the negative (-) batt ...
Relay Box (Passenger Compartment) Component Location
...
Special Service Tools
Item
Illustration
Application
Fuel Pressure Gauge
(09353-24100)
Measuring the fuel line pressure
Fuel Pressure Gauge Adapter
...